At each site, EPA assesses the risk to humans and the environment and determines the best approach
to address the risk. During initial site studies and cleanup, EPA determines if current human
exposures to contaminants are under control and takes actions to control any possible human
exposures until cleanup has been completed. Once complete, cleanup provides long-term human health
and environmental protection at the site.
Current human exposures at this site are under control
At each site with known ground water contamination, EPA documents whether ground water contamination is below protective risk-based levels or,
if not, whether the migration of contaminated ground water is stabilized.
Contaminated ground water migration is not under control
Contaminants (i.e., hazardous substances, pollutants or contaminants) can be found in
several different types of materials on the site including soil and other solid-based
media and water or another liquid-based medium (see glossary).
The contaminants listed via the links below are considered the contaminants of concern
(see glossary) to be addressed by
cleanup actions at the site.
Contaminated Media: Fish Tissue, Sediment, Soil
EPA classifies contaminants found into groups or types
(listed below). To view all contaminants of concern at the
site click on the "view contaminants of concern at this site" link.
Types of Contaminants: Base Neutral Acids, Metals, PAH, PCBs, Persistant Organic Pollutants, Pesticides, VOC
There are many stages of cleanup, including site study, remedy selection, remedy design, remedy construction,
and post-construction. Activities undertaken early in the cleanup process focus on understanding problems at
the site while those taken later in the cleanup process focus on physically addressing those problems identified.
Many NPL sites are large and complicated. These sites are often broken up into smaller areas to make cleanup
easier and more manageable. These areas are called “Operable Units” or OUs
(see glossary).
The chart below shows the different types of activities that are underway or complete at each of the
cleanup areas (operable units) at the site. Some activities apply to the entire site; EPA assigns these
activities to the site-wide operable unit (designated as OU 0).
* At many sites an action, called a "Removal Action" (see glossary),
must be taken to eliminate immediate and near-term threats to human health and the environment. Removal actions
do not occur at all sites.
Community Involvement
The goals of the Superfund community involvement (CI) program are to: 1) keep communities affected
by sites informed throughout the cleanup process, 2) provide opportunities for communities to comment and
offer their input about site cleanup plans, and 3) facilitate the resolution of community issues tied to
a site. EPA accomplishes these goals by providing communities different tools and resources to support
their site involvement. These resources include independent technical assistance so community members
can understand the technical aspects of a site, a public forum for community members to present and discuss
their needs and concerns related to the Superfund decision making process, and a job training program to
encourage employment of local workers. These are just some of the CI program's resources; to learn more, go to
http://www.epa.gov/superfund/community/.
To find out more about community involvement activities at this Superfund site and how you can become
involved in site cleanup/reuse decisions,
view a list of contacts for this site >>.
Land Reuse
EPA places a high priority on land revitalization as an integral part of its Superfund response
program mission, so EPA tries to select cleanup options that encourage and support future use of
a site. Sites made ready for use are deemed "Site-wide Ready for Anticipated Use"
(see glossary), which means, in part, that all cleanup
goals have been achieved for both current and reasonably anticipated future land use.
This site currently does not meet the criteria for Site-wide Ready for Anticipated Use,
however parts of the site may be suitable for reuse.
Post-Construction
Post-Construction (see glossary) is the stage following completion
of the remedy construction. It includes, among other things, activities such as operating the remedy to
address the contamination (e.g., ground water pump and treat); implementing, monitoring, and enforcing
institutional controls; and a review of the implemented remedies at least every five years to ensure they
continue to protect human health and the environment.
Institutional controls (see glossary) such as
administrative or legal restrictions may also be components of remedies at a site that remain
in place post-construction completion.
Sites or portions of sites may be deleted (see glossary) from the
National Priorities List when all cleanup goals have been achieved.
This site has not been deleted from the National Priorities List
Five Year Review Information
At some sites, one of the activities performed during post-construction completion
is a five-year review (see glossary), which occurs at least
every five years to ensure that the site remains protective of human health and the environment.
DISCLAIMER: Be advised that the data contained in these profiles are intended solely for
informational purposes use by employees of the U.S. Environmental Protection Agency for
management of the Superfund program. They are not intended for use in calculating Cost
Recovery Statutes of Limitations and cannot be relied upon to create any rights,
substantive or procedural, enforceable by any party in litigation with the United States.
EPA reserves the right to change these data at any time without public notice.