There is insufficient information to determine the site-wide Human Exposure Control status at the South Jersey Clothing Company Superfund Site because of a newly identified exposure pathway. This pathway involves the inhalation of volatile organic compounds (VOCs) that have potentially migrated from groundwater to indoor air. Groundwater is contaminated with VOCs, including primarily TCE. Use of contaminated groundwater for domestic purposes and agricultural irrigation may pose a potential health threat. Private residences located within the borough boundary down gradient from the sites are connected to the municipal water supply system. The activities planned to make the Human Exposure determination include additional sampling and investigation necessary to determine the extent of possible human exposure through this pathway. EPA has completed the construction of a groundwater treatment facility at the site which is currently in operation. EPA ensures community participation throughout the remedial process by meeting with residents and affected stakeholders, issuing public notices and updating fact sheets. A site profile has been established on the EPA website to keep the community informed of recent progress at the site. Additionally, an EPA Community Involvement Coordinator is assigned to the site and can address specific community concerns as they arise

Top of Page


Contaminant Information

View a full list of contaminants of concern for this site.

Top of Page


Performance Measures

EPA uses performance measures to track environmental results at Superfund sites. If you have any questions or concerns about the measures at this site, please contact the site team members listed under Site Contacts.

Read more about Superfund Remedial Performance Measures.

Performance
Measure
Status at this
Superfund Site
What does this mean?
Human Exposure Under Control Insufficient Data Yes means assessments indicate that across the entire site:
  1. There are currently no unacceptable human exposure pathways; and
  2. EPA has determined the site is under control for human exposure.

No means an unsafe level of contamination has been detected at the site and a reasonable expectation exists that people could be exposed.

Insufficient data means that, due to uncertainty regarding exposures, one cannot draw conclusions as to whether human exposures are controlled, typically because:
  1. Response to the contamination has not begun; or
  2. The response has begun, but it has not yet generated information sufficiently reliable to evaluate whether there are currently any unacceptable human exposure pathways at the site.
Groundwater Migration Under Control Yes

Yes means EPA reviewed all information on known and reasonably expected groundwater contamination. EPA concluded the migration of contaminated groundwater is stabilized and there is no unacceptable discharge to surface water. EPA will conduct monitoring to confirm that affected groundwater remains in the original area of contamination.

No means EPA has reviewed all information on known and reasonably expected groundwater contamination, and the migration of contaminated groundwater is not stabilized.

Insufficient data means that due to uncertainty regarding contaminated groundwater migration, EPA cannot draw conclusions as to whether the migration of contaminated groundwater is stabilized.

Construction Complete Yes

Yes means the physical construction of the cleanup is complete for the entire site.

No means either physical construction is not complete or actions are still needed to address contamination.

Sitewide Ready for Anticipated Use No Yes means:
  1. All cleanup goals affecting current and reasonably anticipated future land uses of the entire site have been achieved, so there are no unacceptable risks;
  2. All required land-use restrictions or other controls have been put in place; and
  3. The site has achieved Construction Complete status.

No means that one or more of these three criteria have not been met. However, a site listed as no may still have redevelopment occurring on portions of the site and may be eligible for additional redevelopment.