Water Line Construction

Water line construction is expected to begin in September 2019 and continue through 2021.

Water Line Construction Progress Reports

Five Year Review reports

On September 28, 2016, the EPA completed the first Five Year Review report for the site.

Institutional controls are required for this site.

This site requires ICs because a decision document, such as a Record of Decision, has documented some level of contamination and/or remedy component at the site that would restrict use of the site. These ICs are required to help ensure the site is used in an appropriate way and that activities at the site do not damage the cleanup components. These ICs will remain in place for as long as the contamination and/or cleanup components stay on site.  In order to determine the current status of ICs for this site, the site contacts should be consulted.

More information about institutional controls at this site.

Top of Page


Site News Archive

News Releases

Top of Page