Superfund Information Systems: Site Profile

Superfund Site:

COAKLEY LANDFILL
NORTH HAMPTON, NH

Stay Updated, Get Involved

Sign up for this Superfund site’s mailing list

On this page:


Announcements and Key Topics

www.epa.gov/superfund/coakley

MEMO REGARDING BEDROCK SUMMARY - CURRENT UNDERSTANDING OF GROUNDWATER FLOW IN VICINITY OF SITE, 05/13/2020 (9 pp, 4 MN About PDF) 

LETTER REGARDING PRIVATE WATER SUPPLY WELL SAMPLING RESULTS LETTER - FALL 2019, 04/22/2020 (1 pp, 700 K, About PDF)

LETTER REGARDING CONDITIONAL APPROVAL OF 01/22/2020 STORMWATER INVESTIGATION REPORT, 04/02/2020 (3 pp, 800 K, About PDF)

EMAIL RESPONSE TO PROPOSED GROUNDWATER SAMPLING PROGRAM, 03/27/2020 (2 pp, 730 K, About PDF)

MEMO REGARDING PROPOSED GROUNDWATER SAMPLING PROGRAM REVISIONS, 03/23/2020 (8 pp, 964 K, About PDF)

EPA COMMENTS ON DEEP BEDROCK INVESTIGATION INTERIM REPORT 02/06/2020 (18 pp, 1.09 ) About PDF

EMAIL REGARDING EPA UPDATE ON THE COAKLEY LANDFILL SITE 01/29/2020 (2 pp, 720.58 KB) About PDF

RESPONSE TO COMMENTS ON STORMWATER INVESTIGATION REPORT (SURFACE WATER EVALUATION SCOPE OF WORK ATTACHED) 01/22/2020 (41 pp, 21.6 MB) About PDF

DEEP BEDROCK INVESTIGATION INTERIM REPORT 11/25/2019 (646 pp, 331.66 MB) About PDF

LETTER PROVIDING US EPA COMMENTS ON 09/2019 STORMWATER INVESTIGATION REPORT, 11/22/2019 (6 pp, 801.68 KB, About PDF)

LETTER REGARDING EPA COMMENTS ON THE DEEP BEDROCK WELL COUPLET FINAL WELL CONSTRUCTION RECOMMENDATIONS, 8/13/2019 (2 pp, 759 K, About PDF)

EMAIL REGARDING EPA APPROVAL OF REQUEST FOR EXTENSION FOR SUBMITTAL OF BEDROCK INVESTIGATION INTERIM REPORT (EMAIL HISTORY ATTACHED) 11/18/2019 (1 pp, 721.16 KB, About PDF)

LETTER REQUESTING DEADLINE EXTENSION FOR THE DEEP BEDROCK INVESTIGATION INTERIM REPORT, 11/13/2019 (1 pp, 789.32 KB, About PDF)

LETTER PROVIDING COMMENTS ON THE DRAFT DEEP BEDROCK RECONNAISSANCE WELL INTERVAL PACKER SAMPLING RESULTS , 10/29/2019 (5 pp, 790.5 KB, About PDF)

MEMO REGARDING DRAFT DEEP BEDROCK RECONNAISSANCE WELL INTERVAL PACKER SAMPLING RESULTS, 09/10/2019 (42 pp, 16.28 MB, About PDF)

STORMWATER INVESTIGATION REPORT, 09/24/2019 (59, 17.5 MB, About PDF) 

LETTER REGARDING DEEP BEDROCK INVESTIGATION INTERIM REPORT DEADLINE EXTENSION, 09/27/2019 (1 pp, 822 K, About PDF)

More Recently Posted Documents

Institutional controls are required for this site.

This site requires ICs because a decision document, such as a Record of Decision, has documented some level of contamination and/or remedy component at the site that would restrict use of the site. These ICs are required to help ensure the site is used in an appropriate way and that activities at the site do not damage the cleanup components. These ICs will remain in place for as long as the contamination and/or cleanup components stay on site.  The site contacts should be consulted if there are questions on the ICs for this site.

More information about institutional controls at this site

Top of Page


Public Participation Opportunities

 

Public Meeting

June 25, 2019 6:00 PM to 8:00 PM

Bethany Church, 500 Breakfast Hill Road

Greenland, NH 03840

 

Previous June 7, 2018 Public Meeting: Coakley Landfill Group Open House  7pm at Community Campus 100 Campus Drive, Portsmouth, NH

SUMMARY OF MARCH 30, 2018 TECHNICAL MEETING REGARDING DEEP BEDROCK INVESTIGATION WORK PLAN (PDF) (4pp, 107 KB)

APRIL 5, 2018 CLG PUBLIC MEETING PRESENTATION

Top of Page


Site News Archive

Community Updates

News Releases

Top of Page