Superfund Information Systems: Site Profile

Superfund Site:

STANDARD CHLORINE OF DELAWARE, INC.
NEW CASTLE, DE

Photos, Videos & Audio

On this page:


Photos

demolition of chemical plant 2006 demolition of chemical plant 2006
Groundwater treatment building, OU1 Interim Remedial Action Groundwater treatment building, OU1 Interim Remedial Action
Trencher used to repair section of the subsurface barrier wall Trencher used to repair section of the subsurface barrier wall
Overview of warehouse dismantlement Overview of warehouse dismantlement
Broken concrete pad pieces loaded into crusher to prep OU3 subgrade Broken concrete pad pieces loaded into crusher to prep OU3 subgrade
Crushed concrete as crews prepare the subgrade for OU3 cap Crushed concrete as crews prepare the subgrade for OU3 cap
Stainless steel gas collection piping, welded and placed in layer of OU3 cap Stainless steel gas collection piping, welded and placed in layer of OU3 cap
Overview of the gas collection layer of the OU3 cap Overview of the gas collection layer of the OU3 cap
Broken pieces of concrete pads are loaded into crusher Broken pieces of concrete pads are loaded into crusher
Rolls of Geosynthetic Clay Liner prior to installation Rolls of Geosynthetic Clay Liner prior to installation
Excavator used during Barrier Wall project Excavator used during Barrier Wall project
decontructing the chemical plant decontructing the chemical plant
empty warehouse 2009 empty warehouse 2009
Remedial Barrier Wall work Remedial Barrier Wall work
Remedial Barrier Wall project Remedial Barrier Wall project
Metachem facility prior to demolition work Metachem facility prior to demolition work
dismantling work dismantling work
Stored totes prior to off-site removal Stored totes prior to off-site removal
Eastern stormwater detention basin following final grading Eastern stormwater detention basin following final grading
Solar powered control panel on one of the extraction wells Solar powered control panel on one of the extraction wells
Supersacks of bentonite. Used in repairs to subsurface barrier wall in 2015 Supersacks of bentonite. Used in repairs to subsurface barrier wall in 2015
Facility prior to demolition Facility prior to demolition
Crushing the remaining concrete foundation Crushing the remaining concrete foundation
OU-2 Wetlands Sampling at Red Lion Creek OU-2 Wetlands Sampling at Red Lion Creek

Top of Page


Videos

Check out some videos from the work at the Standard Chlorine of Delaware Site!

Top of Page