MALONE SERVICE CO - SWAN LAKE PLANT
TEXAS CITY, TX

Photos, Videos & Audio

On this page:


Photos

Malone Service Company Superfund Site – prior to RA construction activities Malone Service Company Superfund Site – prior to RA construction activities
Demolition of Onsite Waste Oil Storage Tanks – tanks are decontaminated and recycled Demolition of Onsite Waste Oil Storage Tanks – tanks are decontaminated and recycled
Aerial April 12, 2016:  RCRA Cell Construction Progress – completed 22-acres of base layer of anticipated 30-acre RCRA Cell Aerial April 12, 2016: RCRA Cell Construction Progress – completed 22-acres of base layer of anticipated 30-acre RCRA Cell
Aerial April 12, 2016:  RCRA Cell Construction Progress – completed 22-acres of base layer of anticipated 30-acre RCRA Aerial April 12, 2016: RCRA Cell Construction Progress – completed 22-acres of base layer of anticipated 30-acre RCRA
Recycling of Onsite Metal Recycling of Onsite Metal
Boom Excavator Mixing of Portland Cement and Flyash to form Solidified Material, which is trucked to RCRA Subtitle C Cell Boom Excavator Mixing of Portland Cement and Flyash to form Solidified Material, which is trucked to RCRA Subtitle C Cell
Completed Solidification Mixing Cell along outer ring of Six-Acre Sludge Pond – black arrows indicate Mixing Cell boundary limits. Completed Solidification Mixing Cell along outer ring of Six-Acre Sludge Pond – black arrows indicate Mixing Cell boundary limits.
Primary 80-Mil HDPE Liner install in Base of RCRA Subtitle C Cell Primary 80-Mil HDPE Liner install in Base of RCRA Subtitle C Cell
RCRA Cell Liner Installation base of Cell – leachate Collection Sump (center frame) RCRA Cell Liner Installation base of Cell – leachate Collection Sump (center frame)
Screening Plant to Remove Debris from Solidified Material going into RCRA Cell Screening Plant to Remove Debris from Solidified Material going into RCRA Cell
Placement of Solidified Sludge into RCRA Subtitle C Cell (landfill) Placement of Solidified Sludge into RCRA Subtitle C Cell (landfill)
Following Tank Demolition, sludge within tank and earthen perimeter berm is solidified in-place and trucked to RCRA Cell Following Tank Demolition, sludge within tank and earthen perimeter berm is solidified in-place and trucked to RCRA Cell