Site-Wide Milestones

Milestone Date(s)
Preliminary Assessment/Site Investigation Completed 05/01/1982
Proposed to the National Priorities List 12/30/1982
Finalized on the National Priorities List 09/08/1983
Remedy Selected 02/23/1983
Final Remedy Selected 09/30/2005
Remedial Action Started 01/07/1986
Construction Completed Not Yet Achieved
Deleted from National Priorities List Not Yet Achieved
Most Recent Five-Year Review 09/24/2015
Site Ready for Reuse and Redevelopment Not Yet Achieved

Top of Page


Cleanup Schedule by Operable Unit

During cleanup, a site can be divided into a number of distinct areas depending on its complexity. These areas, called operable units (OUs), may address geographic areas, specific problems, or areas where a specific action is required. Examples of typical operable units include construction of a groundwater pump and treatment system or construction of a cap over a landfill.

Milestone OU Start Date Completion Date OU ID
Removal OU 00 - SITEWIDE 09/08/1992 10/01/1992 00
Removal OU 00 - SITEWIDE 12/06/1993 04/01/1994 00
Five-Year Review OU 00 - SITEWIDE 09/24/2015 00
Five-Year Review OU 00 - SITEWIDE 09/29/2010 00
Combined Remedial Investigation/Feasibility Study OU 01 - ONSITE PUMP AND TREAT (OU1) 08/15/1979 02/15/1983 01
Record of Decision OU 01 - ONSITE PUMP AND TREAT (OU1) 02/23/1983 01
Remedial Design OU 01 - ONSITE PUMP AND TREAT (OU1) 05/01/1984 01/07/1986 01
Remedial Action OU 01 - ONSITE PUMP AND TREAT (OU1) 01/07/1986 01
Remedial Action OU 01 - ONSITE PUMP AND TREAT (OU1) 05/21/1992 01
Remedial Design OU 02 - OFFSITE PUMP AND TREAT (OU2) 05/01/1984 01/07/1986 02
Remedial Action OU 02 - OFFSITE PUMP AND TREAT (OU2) 10/29/1986 02
Removal OU 03 - SOURCE CONTROL (OU3) 02/06/1997 02/15/2002 03
Removal OU 03 - SOURCE CONTROL (OU3) 09/18/1994 02/15/2002 03
Combined Remedial Investigation/Feasibility Study OU 03 - SOURCE CONTROL (OU3) 07/12/1996 03
Combined Remedial Investigation/Feasibility Study OU 03 - SOURCE CONTROL (OU3) 07/12/1996 03
Record of Decision OU 03 - SOURCE CONTROL (OU3) 09/30/2005 03
Remedial Design OU 03 - SOURCE CONTROL (OU3) 09/22/2008 03
Remedial Design OU 03 - SOURCE CONTROL (OU3) 09/23/2011 03
Remedial Design OU 03 - SOURCE CONTROL (OU3) 09/28/2016 03
Remedial Action OU 03 - SOURCE CONTROL (OU3) 09/23/2011 09/23/2015 03
Remedial Action OU 03 - SOURCE CONTROL (OU3) 09/28/2016 03
Remedial Action OU 03 - SOURCE CONTROL (OU3) 12/17/2009 03

DISCLAIMER: The data on this page are derived from the Superfund Enterprise Management System and are solely for informational purposes. The data cannot be relied upon to create any substantive or procedural rights or requirements enforceable by any party in litigation with any member of the public, states, tribes, the United States or any federal agency. EPA reserves the right to change these data at any time without public notice.