EPA Superfund Program: ASBESTOS DUMP, MILLINGTON, NJ

Superfund Site Profile

The Asbestos Dump site consists of an 11-acre property in Millington, New Jersey, and three separate satellite sites: 1) the 12-acre White Bridge Road site, 2) the 30-acre New Vernon Road site, and 3) the 7-acre Dietzman Tract site in the Great Swamp National Wildlife Refuge (GSNWR). An asbestos products manufacturing facility operated at the Millington site; asbestos wastes were disposed of at the satellite sites. Long-term operation and maintenance of the remedy at the Millington property is ongoing. Cleanup of the satellite sites has been completed. EPA took the site off the Superfund program’s National Priorities List in July 2010.


EXPLORE THIS SITE


SITE STATUS

Construction
Complete?
Yes (06/30/2000)
Human Exposure
Status

Under Control
Contaminated Ground
Water Status
Not a Ground Water Site
Site-Wide Ready for
Anticipated Use?
Yes