The Electro-Coatings, Inc., Site is located at 911 Shaver Road Northeast on the north side of Cedar Lake in Cedar Rapids, Iowa. The Electro-Coatings plant in Cedar Rapids has been in operation since 1947. The plant has performed chromium, cadmium, nickel and zinc plating. In March 1976, a yellow tinge was noted in the cooling water being discharged to Cedar Lake from Hawkeye Rubber Manufacturing Company (Hawkeye Rubber) located immediately west of the Electro-Coatings plant. This water was found to contain high levels of chromium which was tracked to a leaking concrete tank containing chromic acid at the Electro-Coatings plant. Moderate amounts of chlorinated solvents were subsequently detected in the groundwater at the site. Shortly after the chromium contamination was discovered the discharge from Hawkeye Rubber was moved to the sanitary sewer. Electro-Coatings immediately took actions to stop the leak and conducted improvements to prevent additional contaminant releases from their facility.

In 1989, the site was placed on the Superfund National Priorities List due to concern that chromium contamination might affect municipal wells of the City of Cedar Rapids, the closest of which is about 2,000 ft. west of the site. No impact to the city wells from the Electro-Coatings, Inc., Site, has ever been found.

A series of investigations led to the selection of a cleanup plan in the 1994 Record of Decision(ROD). The remedy selected was groundwater monitoring with a contingency for pump-and-treat in the event the Hawkeye Rubber Plant production well was shut down, given that it was pulling contamination away from the Electro-Coatings Site.  These investigations also revealed solvent contamination of groundwater from Hawkeye Rubber. The Hawkeye Rubber production well was found to substantially prevent further migration of the chromium and solvent-related contamination. The cleanup plan called for continued pumping of the Hawkeye Rubber production well, groundwater monitoring, and contingencies for additional action in the event of subsequent discovery of significant off-site migration of contaminants.

It wasn't until 1999 that Iowa Department of Natural Resources (IDNR) entered into a consent order with Electro-Coatings for implementation of the cleanup plan. However, the Hawkeye Rubber production well continued to operate in accordance with the ROD during the interim.

Operation of the former Hawkeye Rubber production well PW-1 continued until August 2006, except for several months in 2003 due to a fire. Chromium has not been detected above the drinking water maximum contaminant level (MCL) in water from PW-1 since September 2003. However, contaminated soil remains beneath the building.


SITE STATUS

Construction
Complete?
Yes (09/14/2000)
Human Exposure
Status

Under Control
Contaminated Ground
Water Status
Under Control
Site-Wide Ready for
Anticipated Use?
Yes